Everything is included...

          You'll just need some basic tools and some concrete!

     Tool list:

              

               -Shovel for site preparation

               -Post hole digging equipmenent

                           You can rent an auger from yout local tool for about $200 in most areas.  

               -Tape measure

              -Concrete mixing equipment

                          Wheelbarrow

                          Hoe

 

      Add some concrete

        

      You can get concrete from your local ready mixed concrete plant  or pick up dry concrete mix in bags at your local hardware store or home center. Use the table below to determine how much concrete you'll need.    

 

# of Bags of Concrete Required to Fill Two Holes

 

 

 

 

 

 

 

 

 

 

Hole Diameter

Hole Depth (in Feet)

Concrete Weight per Bag

CF/Bag

12"

16"

18"

24"

 

 

 

 

 

 

 

3

 

40

0.3

16

28

35

63

 

45

0.34

14

25

31

56

 

60

0.45

11

19

24

42

 

80

0.6

8

14

18

32

 

90

0.68

7

13

16

28

 

 

 

 

 

 

 

3.5

 

40

0.3

18

33

41

73

 

45

0.34

16

29

37

65

 

60

0.45

12

22

28

49

 

80

0.6

9

17

21

37

 

90

0.68

8

15

19

33

 

 

 

 

 

 

 

4

 

40

0.3

21

37

47

84

 

45

0.34

19

33

42

74

 

60

0.45

14

25

32

56

 

80

0.6

11

19

24

42

 

90

0.68

10

17

21

37

 

 

 

 

 

 

 

4.5

 

40

0.3

24

42

53

94

 

45

0.34

21

37

47

83

 

60

0.45

16

28

35

63

 

80

0.6

12

21

27

47

 

90

0.68

11

19

24

42

 

 

 

 

 

 

 

5

 

40

0.3

26

46

59

105

 

45

0.34

23

41

52

92

 

60

0.45

18

31

39

70

 

80

0.6

13

23

30

53

 

90

0.68

12

21

26

46

 

 

 

 

 

 

 

5.5

 

40

0.3

29

51

65

115

 

45

0.34

25

45

57

102

 

60

0.45

19

34

43

77

 

80

0.6

15

26

33

58

 

90

0.68

13

23

29

51

 

 

 

 

 

 

 

6

 

40

0.3

31

56

70

125

 

45

0.34

28

49

62

111

 

60

0.45

21

37

47

84

 

80

0.6

16

28

35

63

 

90

0.68

14

25

31

56

 

 

 

 

 

 

 

6.5

 

40

0.3

34

60

76

136

 

45

0.34

30

53

67

120

 

60

0.45

23

40

51

91

 

80

0.6

17

30

38

68

 

90

0.68

15

27

34

60

 

 

 

 

 

 

 

7

 

40

0.3

36

65

82

146

 

45

0.34

32

57

73

129

 

60

0.45

24

43

55

98

 

80

0.6

18

33

41

73

 

90

0.68

16

29

37

65

 

 

Amount of Concrete if Buying per Cubic Yards

 

Hole Diameter

Hole Depth (in Feet)

12”

16”

18”

24”

 

 

 

 

 

3

 

0.2

0.3

0.4

0.7

3.5

 

0.2

0.4

0.5

0.8

4

 

0.2

0.4

0.5

0.9

4.5

0.3

0.5

0.6

1.0

 

5

 

0.3

0.5

0.6

1.2

5.5

 

0.3

0.6

0.7

1.3

6

 

0.3

0.6

0.8

1.4

6.5

 

0.4

0.7

0.8

1.5

7

 

0.4

0.7

0.9

1.6